screenshot_2026-03-25_14-05-58

气凝胶保冷防结露涂料 HUALU Pyshield AC-GY-01L200

气凝胶保冷防结露涂料可直接喷涂(刷涂)于管道表面、储罐内外壁、异形结构、冷库、屋顶等。杜绝冷桥缝隙,施工周期仅为传统发泡材料的1/3,无空洞隐患,轻量化,干膜无有害物质析出,符合食品(制药行业)卫生安全要求。长期保冷,避免物料因温度波动变质、降低介质输送能耗。

产品优势

1.优异的保冷性能(可减少冷损失20%以上)
2.可实现“绝对防结露
3.安全环保
4.无缝涂覆,彻底阻断冷桥
5.施工高效便捷
6.憎水防潮,长效稳定

 

产品参数

 

项目

ltem

参数

Parameter

颜色

Color

白(可调)

White(customizable)

导热系数

Thermal Conductivity

≤0.032W/(m·k)@25℃℃

密度

Density

0.58±0.02 g/cm³

粘结强度

Bond Strength

≥0.6 MPa

耐水性

Water Resistance

浸水96h无异常

No abnormality after 96h immersion

燃烧性能

Combustion Performance

B1

VOC含量

VOC Content

≤70g/L

柔韧性

Flexibility

直径100 mm无裂纹

No cracks at 100 mm diameter

初期干燥抗裂性(6h)

Initial Drying Crack Resistance(6h)

-40℃~70℃

规格

Specification

10 kg/20 L

用量

Usage

0.6(kg/mm/㎡)

 

 

涂层设计结构

 

项目

ltem

参考厚度(mm)
Reference Thickness(mm
防锈底涂
Anti-Rust Primer
<0.5 mm

气凝胶保冷防结露涂料
Cold-Preservation and
Aerogel Cold Insulation and
Anti-Condensation Coating

2-6 mm
面漆
Top Coat
<0.5 mm

 

 

 

 

 

产品应用

气凝胶保冷防结露涂料可用于低温介质输送管道系统(如化工、冷链、能源行业)、中小型低温储罐/ 缓冲罐(如制药、食品加工、精细化工)、中低温反应釜外层保冷(如精细化工、医药中间体生产)、工业冷库/低温车间墙体/屋顶(如食品冷链仓储、低温实验室)、新能源电池储能柜外层温控(如工业储能电站、新能源配套储能)。

 

 

 

施工要求

 

项目

ltem

喷涂

Spray Coating

基面要求
Surface Requirements
基材表面干净、无杂物,无油脂,必要时进行清洗,去油和批灰等处理。已锈蚀区域应做转锈-防锈处理后再施工。易锈蚀区域应做防锈处理后再施工。
The substrate surface must be clean,free of debris, and oil-free, Clean, degrease, and apply putty if necessary. Rusted areas should undergo rust conversion and ant-rust treatment before application, Prone-to-rust areas should be treated with anti-rust measures prior to coating.

施工工具
Tools Required

喷涂机、辊筒、美纹纸、搅拌器、防护口罩、防护服、安全绳、安全帽、防护鞋、护目镜、保护膜
Spray machine, roller, masking tape, mixer, protective mask, protective clothing, safety rope, safety helmet, safety shoes, goggles protective film
施工工艺
Mixing Instructions
开桶搅拌:请先检查涂层原料有无明显分层现象,如有分层现象可用搅拌方式搅拌均匀,不可高速分散。搅拌时间应在3-5分钟,喷涂施工厚度单次不超过2 mm,间隔12小时后再重喷,具体厚度可商定。
Open the container and stir: First check for significant stratification in the coating material, f stratification is observed, mix uniforml by stirring-do not use high-speed dispersion, Stir for 3-5 minutes, The construction thickness should not exceed 2mm per application, and re-spraying should be performed after an interval of 12 hours. The specific thickness can be customized.
重涂间隔
Recoat Interval
涂抹次数在1-5遍,建议每次控制在2mm以内,每遍干透后再涂下一层,间隔时间12小时,达到厚度要求后,需自然干燥7天后方可投入使用,具体施工方式及厚度可根据施工环境、喷涂面积,质量要求及客户需求来确定。
Apply 1-5 avers, with each aver recommended to be under 2mm, Allow each laver to dry completely before applvina the next (12-hou interval, After reaching the reauired thickness, the coating must air-dry naturally for 7 davs before use, The specific application method and thickness should be determined based on the construction environment, spray area, quality requirements, and customer needs.
施工条件
Construction Conditions

1.施工温度不低于5℃,环境湿度小于65%,若环境湿度大于85%时,重涂时间延长;
2.避免刮风下雨天气施工。
1. Ambient temperature should not be below 5*c, and humidity should be below 65%, lf humidity exceeds 85%, the recoating
interval needs to be extended.
2.Avoid construction during windy or rainy weather.

点我购买